Quasar relay testing FAQ: 34 questions on secondary injection

EuroSMC Quasar is a secondary injection test system for verifying protection relays and protection schemes. It generates controlled electrical signals and monitors the relay response, helping engineers check settings, operating thresholds, trip times and logic during commissioning and maintenance. This guide explains the main test methods, digital substation applications and the distinction between Quasar direct control and optional ROOTS software.

The required configuration depends on the relay, the test method and the installed hardware and software. This article explains how to choose and interpret tests; it does not replace the equipment manuals or an approved site procedure. Testing must be carried out by qualified personnel.

Quasar relay test set in its integral case, with current, voltage and binary connections visible
Quasar secondary injection relay test set. Channels and optional software depend on the supplied configuration.

Understanding and selecting Quasar

01. What is Quasar used for in protection relay testing?

Quasar is a secondary injection relay test system that applies controlled current and voltage signals to a protection relay and measures its response. Typical checks include operating thresholds, trip times, directional behaviour and protection logic.

Its direct control functions support individual tests, while optional ROOTS software adds structured, automated test routines and reporting. The test objective determines the signals, binary connections and software functions required. A relay passing one test point does not establish that its entire protection scheme has been verified.

02. What is the difference between Quasar secondary injection and Raptor primary injection?

Quasar tests protection relays by injecting signals at their secondary inputs. Raptor is a primary injection system intended for tests involving high current in the primary circuit. The two methods address different parts of the protection chain.

Secondary injection is well suited to detailed checks of relay settings and characteristics. Primary injection can include the instrument transformer and associated secondary circuit in the test path, depending on the arrangement. Choose the method from the required verification scope; a secondary injection result alone does not prove the complete primary measurement chain.

03. Are Quasar Quasar Plus and Quasar 3C the same configuration?

The base Quasar has three dedicated current outputs and four voltage outputs. Quasar 3C is an optional extension that adds three dedicated current channels. EuroSMC’s May 2026 range overview describes Quasar upgraded with 3C as Quasar Plus; confirm the exact supplied configuration rather than relying on the name alone.

Quasar-C, Quasar-C+ and Quasar-V are other configurations in the range. Quasar-C+ is not the same as Quasar Plus. Check their specific channel arrangements rather than applying the base Quasar specifications to them. Converted voltage channels do not acquire the rating of dedicated high-current channels.

04. How many current and voltage outputs does Quasar provide?

The base Quasar has four voltage channels and three dedicated high-current channels. The voltage channels can be configured as current sources up to 5 A, allowing alternative arrangements; use of the fourth voltage channel as an auxiliary DC supply affects the available combination.

The reviewed catalogue specifies 0 to 35 A for each dedicated current channel, with 60 A available for 3 seconds, and up to 300 V AC or DC per voltage channel. The optional 3C adds three dedicated current channels for a 4V6I arrangement. Confirm the supplied variant, burden, duty cycle and simultaneous output capability: neither a six-current configuration nor a ten-current configuration means that every channel has the same high-current rating.

05. Why do output power and relay burden matter as much as maximum current?

A relay tester must deliver the required current into the actual impedance of the test circuit. Maximum current alone does not establish whether a test is feasible; output power, available voltage, lead resistance and duty cycle also matter.

This is particularly important for high-burden electromechanical relays and tests with long leads. Quasar documentation lists different output arrangements with different current and power capabilities. Select the arrangement against the complete test load and permitted duration. Do not assume that a peak current rating can be maintained continuously or combined with every other maximum rating.

06. Can Quasar be controlled from a tablet or a Windows computer?

Quasar documentation describes direct control from an Android tablet or a Windows computer, with Wi-Fi or wired Ethernet connection. ROOTS is the separate Windows-based option for more extensive automated relay testing.

Confirm the supported operating system version, application release and connection method for the unit being supplied. A reference to a planned platform in an older brochure is not proof that it is available. For field work, check site restrictions on wireless connections and establish the permitted control arrangement before testing.

Back to contents

Basic relay test methods

07. How do I test the response time of a protection relay to a specific fault?

Use a defined pre-fault, fault and post-fault sequence, and measure the relay response against the agreed fault-start event. Quasar’s Fault function supports these three states, including their electrical quantities, duration, logic states and trip conditions.

The pre-fault state establishes the intended initial condition, including polarization where the relay requires it. The fault state applies the test condition, and the post-fault state represents its removal or the next system condition. Quasar presents timing results numerically and graphically. Specify whether the result covers a relay contact, a communicated signal or a wider trip chain before comparing it with an acceptance limit.

08. What is the best way to find relay pickup and dropout values?

Use a ramp when you need to observe the threshold as a quantity rises or falls. Quasar supports single and double ramps for quantities such as current, voltage, phase angle and frequency.

Pickup is the transition into the operated state; dropout is the return to the reset state. The ramp direction, step size, duration and relay reset conditions influence the measured result. A double ramp changes two quantities together, which can be useful for impedance or volts-per-hertz tests. Choose these parameters from the relay characteristic rather than assuming that one ramp setting is suitable for every protection function.

09. When should I use binary search instead of a ramp?

Binary search is useful when the operating threshold is unknown or when you want to locate a threshold by narrowing a defined search interval. Quasar’s Binary Search function adapts the test values to the relay response instead of applying a fixed increment.

A ramp is often preferable when the path or rate of change is part of the behaviour being tested. Binary search is not an unconditional guarantee of greater accuracy: the search limits, stopping criterion, dwell time, relay memory and reset conditions still matter. Record these settings so that the threshold result can be repeated and interpreted correctly.

10. What is a pulse ramp and when is it useful?

A pulse ramp applies successive test pulses separated by a defined return state. Quasar’s Pulse Ramp function can return to low-current or zero-current conditions between pulses, making it useful for locating instantaneous or definite-time overcurrent operation.

The return state can reduce continuous thermal exposure and allow the relay to reset. It does not guarantee that overheating or damage is impossible. Pulse amplitude, pulse duration, repetition rate and the permitted ratings of the relay, leads and test set must all be respected. Use the relay manufacturer’s limits and the approved test procedure to set the sequence.

11. How are reclosing cycles and other complex protection schemes tested?

Use a state sequence that reproduces the expected electrical conditions and logic transitions. Quasar’s State Sequencer programs the available analogue and binary outputs into successive states for tests such as autoreclosing, selective tripping and interdependent protection actions.

Define what starts each transition, which signal should operate and the permitted timing. The sequence should include relevant reset, dead-time and lockout conditions rather than only the first trip. Review the event log alongside the state changes to identify whether an unexpected result comes from the relay element, the logic or the test configuration.

12. Can Quasar replay a fault recorded in a COMTRADE file?

Yes. The Quasar catalogue includes transient fault playback as a standard direct control function and describes loading COMTRADE records from a USB flash drive. It identifies ASCII and binary records following IEEE C37.111.

Before replay, check the record format, channel mapping, scaling, sampling information and the output limits of the actual test set. A field record can help investigate a real event, but successful file loading alone does not establish faithful reproduction of every recorded component. The relay’s initial condition and the available pre-fault portion of the record also affect the result.

Back to contents

Testing protection functions

13. How are instantaneous and inverse time overcurrent elements verified?

Verify pickup and operating time separately, using test points appropriate to the configured overcurrent characteristic. Instantaneous overcurrent is commonly identified as ANSI 50 and time overcurrent as ANSI 51. Directional supervision, where used, adds conditions that must also be satisfied.

Quasar’s direct functions can support threshold and timing checks; its pulse ramp is useful for selected instantaneous or definite-time tests. The optional ROOTS Overcurrent module provides characteristic templates, including IEC, IEEE, ANSI and U.S. characteristic families described in the catalogue. Select the actual relay curve, time setting and tolerances rather than relying on a generic curve name.

14. How do I test a directional protection relay?

Test the relay’s operating and restraining directions against its configured polarization and characteristic angle. Quasar can control current, voltage and their relative phase angle; the optional ROOTS Overcurrent module includes directional test views.

The approved test definition must account for the relay convention, CT and VT polarity, phase sequence, fault type and active settings. There is no universal forward angle, reverse angle or test voltage valid for every directional relay. Verify the directional boundaries and applicable timing under the manufacturer’s specified conditions. A relay that does not trip may be correctly restrained by a directional or voltage-supervision element.

15. How are the operating characteristics of distance relays evaluated?

Distance protection is tested by applying current and voltage combinations that represent selected impedances, then checking zone boundaries and operating times. The optional ROOTS Distance module provides a graphical characteristic editor and supports importing relay characteristics using RIO and X-RIO formats described in the documentation.

Tests should reflect the active phase or earth-fault loop, zone reach, time delay and compensation settings. ROOTS documents constant-current, constant-voltage and constant-source-impedance fault models. Source impedance can affect the relay response; it is not interchangeable with the impedance measured by the relay. Confirm the supported model and settings in the installed version, and do not treat one trajectory or zone shape as sufficient to validate the entire distance scheme.

16. Can Quasar test differential protection?

Quasar can be used for differential protection testing when its current-channel configuration matches the required test. The optional ROOTS differential functions described in the catalogue include operating characteristic and harmonic restraint tests, with a dedicated transformer differential application.

A useful test plan covers the relationship between differential and restraint current, relevant CT ratios and, for transformer protection, the applicable connection and compensation settings. Check stability as well as operation. Do not assume that all six current outputs have identical ratings or that the available channels reproduce every multi-winding arrangement without a configuration review.

17. Can Quasar test voltage frequency and rate of change of frequency protection?

The Quasar documentation covers voltage and frequency protection, with optional ROOTS modules for structured testing. The ROOTS Frequency module includes overfrequency, underfrequency, rate of change of frequency and overexcitation functions.

For a frequency test, specify the starting frequency, rate of change, operating threshold, timing and any voltage inhibition condition. For voltage protection, use the correct measured quantity and phase arrangement. A frequency ramp and an oscillographic replay are different test methods; choose the method that represents the relay function and record it in the result. Confirm the required ROOTS module is included in the licence.

18. How is synchronism check protection tested?

Synchronism check testing verifies whether a relay permits or blocks closing for specified differences in voltage, frequency and phase angle. The optional ROOTS Synchronism module described in the Quasar catalogue supports checks of these limits and relevant live or dead system conditions.

The test must reflect the relay’s actual closing logic, including the enabled voltage conditions and any timing or compensation settings. Check both permissive and blocking cases. Testing the synchronism-check relay does not authorize operating a circuit breaker or paralleling live systems; those actions remain subject to the site’s switching and safety procedures.

Back to contents

Digital substations and advanced applications

19. How does Quasar support IEC 61850 GOOSE testing?

The Quasar catalogue describes a dedicated IEC 61850 Ethernet interface and native GOOSE message monitoring. It can discover published GOOSE messages, subscribe to selected data and display changes, supporting tests that use communicated states rather than only hardwired contacts.

Define the intended publisher, dataset, signal meaning and expected timing before evaluating a result. Confirm the exact GOOSE functions, virtual input and output allocation, and software configuration of the supplied unit. Network access and test-message handling must follow the substation’s approved procedure so that test traffic cannot cause unintended operation.

20. Does IEC 61850 GOOSE support also mean support for Sampled Values?

No. GOOSE messaging and IEC 61850 Sampled Values are distinct functions. The cited Quasar catalogue documents GOOSE; that statement alone does not establish Sampled Values generation, subscription or complete process-bus testing capability.

For a digital substation project, specify each required function separately, including the relevant message or sampling profile, timing method, network interface and interoperability requirements. Ask EuroSMC to confirm the exact hardware and software support. Likewise, do not assume support for every SCL file type or import workflow solely because an IEC 61850 port is present.

21. Can Quasar test devices that require low level analogue signals?

Quasar documentation lists six low-level outputs with a range of 0 to 10 V AC peak and a maximum current of 1 mA. These outputs can be relevant where the device under test accepts compatible low-level analogue signals.

Compatibility must be checked against the device’s input range, scaling, burden, connector and pin assignment. A low-level output is not evidence of universal compatibility with every sensor or recloser. Do not confuse peak voltage with RMS voltage or assume the output is a 0 to 10 V DC interface. Confirm the required cables and application before connecting the equipment.

22. How is an end to end protection test performed with Quasar?

An end-to-end test uses coordinated test systems at the relevant terminals to reproduce one consistent network event and evaluate the complete protection and communication scheme. Each terminal needs the local current and voltage quantities appropriate to its position; the waveforms are not necessarily identical.

Before planning the test, obtain confirmation of the Quasar hardware, software and synchronization accessories required for the selected method. Agree the common timing reference, trigger method and acceptance criteria, then include the teleprotection path and its expected delay in the assessment. Do not assume built-in GPS, IRIG-B support or a particular synchronization accuracy without configuration-specific documentation.

23. Can harmonic signals be used during Quasar relay tests?

The Quasar catalogue includes superimposed harmonics in direct control, and optional ROOTS differential functions include harmonic restraint testing. This is useful when a protection function must distinguish a fundamental-frequency condition from a waveform containing specified harmonic components.

Define the harmonic order, magnitude, phase relationship and the way the relay expresses its restraint threshold. The generated waveform must remain within the applicable output limits. A harmonic restraint test verifies a selected protection response; it should not be presented as a complete simulation of every transformer energization or power-quality event.

24. Can Quasar test transducers and energy meters as well as relays?

The Quasar catalogue describes measurement functions for transducers with DC voltage or milliampere outputs and for devices that provide pulse outputs. It allows the measured signal to be related to the device’s engineering units through the configured conversion ratio.

For meter applications, optical scanning heads are listed as optional accessories. Check the device output type, measurement range, pulse constant and required sensor before selecting the test. These functions do not by themselves establish compatibility with every meter interface or a complete metrological certification procedure.

Back to contents

Software results and repeatable testing

25. Which test functions are included in Quasar direct control?

The Quasar catalogue lists Fault, single and double ramps, Pulse Ramp, Binary Search, State Sequencer and COMTRADE playback among the built-in direct control functions. Direct control also provides settings for the available electrical outputs and monitoring of the relay response.

This lets engineers carry out individual checks and defined test sequences without treating a ROOTS licence as mandatory for every test. The catalogue is the reference for these statements; confirm the supplied application version and contractual scope when ordering. Standard direct control functions and optional automated protection modules should be listed separately in the quotation.

26. What does ROOTS add and is it included with every Quasar?

ROOTS is optional Windows-based relay testing software, not a synonym for Quasar’s standard direct control. The Quasar catalogue describes modular purchasing, with one or more functional modules selected for the required protection applications.

ROOTS adds structured relay data, protection characteristics, test procedures, automated execution and reporting. The necessary modules depend on the work, such as overcurrent, distance, differential, frequency or synchronism testing. Confirm the exact licence and supported software version in the offer; a demonstration of a module does not establish that it is included with the test set.

27. Can relay settings and RIO or X RIO files be imported?

The ROOTS functions described in the Quasar catalogue include management and import of relay settings using RIO, X-RIO and other formats, with distance-characteristic, differential, current and voltage import specifically documented. This can reduce manual entry when a suitable file and supported import path are available.

An imported file still needs verification against the relay’s active settings. Check units, CT and VT ratios, zone definitions, compensation and the selected protection elements before running the test. Do not assume that every manufacturer’s file or every relay setting is imported without interpretation or additional configuration.

28. Can test procedures be saved and reused for maintenance?

Yes. The Quasar catalogue describes saving prepared procedures, and ROOTS stores relay data, characteristics, test definitions and results in self-contained files. These can support repeated maintenance tests and templates for similar installations.

Reuse the method, but verify the installation-specific settings before each run. Changes to relay firmware, active setting groups, CT and VT ratios, wiring or protection logic can invalidate an old template. Keep the previous approved procedure and its results identifiable, so that a new result is compared with the correct baseline rather than an undocumented copy.

29. What should a useful relay test report contain?

A useful report identifies the relay, the active settings, the test equipment and the exact conditions under which each result was obtained. ROOTS provides reporting functions, while Quasar’s direct test functions display results and event information for analysis.

Include the test method, injected quantities, expected behaviour, measured thresholds or times, acceptance limits and final assessment. For traceability, also record the unit identification, calibration status, software version and any relevant binary or GOOSE mapping. Distinguish an untested function from a failed test, and explain deviations instead of relying on a pass label without its underlying evidence.

30. What should I check if the relay does not respond as expected?

First confirm that the test represents the relay’s active settings and that the expected output is actually being monitored. Common items to review include the enabled protection element, polarization, phase sequence, binary input interpretation, threshold and reset conditions.

Check whether the test set can sustain the required signal into the connected burden, and compare the event log with the programmed sequence. An unexpected result is not automatically proof of a defective relay. Stop if the wiring, isolation or device ratings are uncertain; resolve the discrepancy under the approved procedure before changing the test or increasing the output.

Back to contents

Safe field use and configuration

31. What safety precautions are essential before secondary injection testing?

Secondary injection testing requires qualified personnel, a defined isolation boundary and an approved procedure. Identify all trip paths, auxiliary supplies, CT and VT circuits, and communicated outputs that could affect equipment outside the intended test scope.

Never open an energized CT secondary, and do not apply test signals to an energized or incorrectly isolated circuit. Follow the relay and test-set manuals for earthing, connections, output limits and restoration. Coordinate GOOSE or teleprotection testing with the responsible site personnel. This FAQ provides application guidance, not a switching instruction or a substitute for a site risk assessment.

32. How should Quasar calibration and measurement uncertainty be managed?

Use a calibration programme appropriate to the test set, its use and the organization’s quality requirements. The Quasar catalogue describes a guided calibration process for qualified laboratories, but it does not justify one universal recalibration interval for every user.

Before accepting results, confirm the equipment identification, calibration status, applicable ranges and uncertainty against the required relay tolerances. Resolution is not the same as accuracy, and neither alone describes the uncertainty of the complete test. Follow EuroSMC’s current service instructions and the approved quality procedure if a channel is damaged, repaired or suspected to be out of tolerance.

33. What should be checked before taking Quasar to a substation?

Confirm the exact unit, required leads and accessories, available site supply, control device and approved connection method before travelling. The Quasar catalogue describes an integral wheeled ABS case with a telescopic handle, but transport suitability still depends on the actual unit and conditions.

Check the operating environment against the applicable manual, and confirm that the necessary software, relay data and test procedures are available for the planned work. Do not assume airline cabin acceptance from a product description. Inspection, protective packing and the site’s electrical and cybersecurity rules remain part of field preparation.

34. What information should I provide when requesting a Quasar configuration?

Provide the relay models and settings, protection functions and test scope, together with the current and voltage requirements at the actual burden. This allows EuroSMC to match the hardware and software to the work rather than selecting a system from maximum output figures alone.

Specify the number and type of channels, nominal relay inputs, timing and logic needs, GOOSE or other digital requirements, low-level interfaces and any end-to-end application. Request a line-by-line list of included direct control functions, optional ROOTS modules, cables, synchronization accessories and training. Confirm the exact model, supported versions, calibration documentation and acceptance criteria before ordering.

Back to contents

Relay testing in data centers, ships and wind farms

The value of a portable relay test set depends on the protection task and the working environment. The following are application examples, not reports of a particular installation or evidence of sector-specific certification. The relay, available channels, software and approved test procedure must match each job.

Data centers and critical power distribution

In a data center, secondary injection can verify protection relays associated with incoming supplies, transformers, feeders and bus sections, where those relays are installed. Typical tasks include checking overcurrent pickup, trip times and interlocking logic against the approved settings. A compact test set can be practical when moving between electrical rooms.

Plan the isolation boundary and test window with the operations team, including any risk of unintended trips or changes to redundancy. These tests do not establish UPS autonomy, server performance or complete site availability. Primary-circuit and circuit-breaker checks may also be required by the commissioning plan.

Protection relay checks inside ships

On board a ship, secondary injection is relevant to compatible protection relays in generator, feeder and distribution switchboards. Depending on the installed scheme, checks may cover overcurrent, voltage, frequency or synchronism-check functions. Moving a compact unit through passages can be useful, provided access and a suitable working position have been assessed.

Confirm the operating environment, shipboard supply and earthing arrangements, access permits and any owner or classification requirements. Do not infer that the equipment may be operated on an exposed deck or while a vessel is moving in unsuitable conditions.

Wind turbines and wind-farm protection

A realistic wind-energy application is testing compatible protection relays in turbine-base switchgear, collector-network feeders or a wind-farm substation. Overcurrent, directional, voltage and frequency checks can be selected to match the actual protection settings and available Quasar configuration. This concerns the electrical protection scheme, rather than a general test of turbine controls or converter electronics.

A compact case can simplify transport between test locations. Taking equipment into a nacelle requires a separate access, lifting and handling assessment; a 19.5 kg unit must not be assumed suitable for carrying on a ladder. Confirm weather exposure, working space, restraint, lifting method and all local and offshore requirements before planning the work.

Portability includes an integral transport case

EuroSMC lists the base Quasar at 19.5 kg with an integral ABS case, wheels and an extensible handle; no separate travel case is needed. The public brochure gives dimensions of 56 × 23 × 35 cm. Check the supplied configuration and total transport load, including leads, control device and accessories.

Compact dimensions can help with transport and storage, but access must be measured and the unit needs a stable operating position, suitable ventilation and an approved supply. Transport protection does not establish an operating ingress-protection rating. Confirm actual limits in the applicable manual rather than assuming outdoor, marine or aviation suitability.

Back to contents

Product information and related reading

Need to select a Quasar configuration for your relays? Send EuroSMC the relay models, protection functions and required test conditions so that the proposed hardware, software modules and accessories can be checked against your application.

Discuss your relay testing application with EuroSMC

Contact

CONTACT
Close