Raptor primary test system

Raptor primary test system

Multifunctional Primary Testing System

The Raptor system consists of a main ‘master’ unit and a number of optional units that enable the  execution of virtually any commissioning or routine testing jobs on the primary equipment of medium and high voltage electricity installations.

Description

Massive use of digital technology and innovative design turn the Raptor system into the most portable primary test set available, at a very attractive price.

The simplest Raptor configuration gathers a comprehensive set of resources and test functions in an ultra compact, remarkably portable 77-lb (35 kg) body: master unit, detachable touch-screen console, voltage and current measurement inputs, dual voltage / current test source, binary input, and a 3-kVA digital amplifier for a maximum 9,500 A current injection with variable frequency. A large diversity of test jobs can be accomplished, including circuit breaker and re-closer testing, ground grid integrity verification, transformer saturation analysis, burden and ratio measurement, and more.

For high current applications, the Raptor implements the ‘pass-through secondary’ technique, utilizing its unique hole in the center of the machine. You only need to drive the current conductor through the Raptor and attach both ends to the device that you are testing. Multiple cables can be used in parallel to increase the effective cross section, and the compliance voltage can easily be multiplied by simply doing multiple passes though the RAPTOR with yout test cable. If additional power is required,5-kVA slave units can be added for up to a total 18 kVA, with a maximum 15,000 A injection. These units communicate with the master unit via an infrared link, meaning no physical connection between the units is required. An integrated software calculator allows you to easily determine the equipment and amount of cabling required to reach a specific amount of current.

Tests requiring a moderately high AC voltage up to 2,000 V can be accomplished by adding the Raptor HV to the system. These jobs include power transformer evaluation, voltage withstand / isolation tests, and step & touch voltage measurement, among others. The Raptor HV is visually similar to the other Raptor units but lacks the characteristic center hole in the current injection models.

No matter the combination of master and optional units used, the entire Raptor system is controlled as a single device from the control console in the master unit. This small command center features a magnetic rear face and implements a comprehensive collection of pre-configured tests that can be customized and extended by the user. Custom settings and test results are permanently stored for subsequent download from a PC via a standard USB port. The Raptor console can be directly updated over the Internet via its built-in RJ-45 Ethernet® LAN connection.

The Raptor is a stabilized injection system, i.e. it will compensate small supply and load variations automatically to guarantee the test values throughout the entire job’s duration. Its compact and robust design enables the use by a single person, and its modular concept avoids the need of investing in unnecessary features or carrying equipment that you will not need.

CHARACTERISTICS

  • Compact and lightweight.
  • Integral wheels and handle.
  • Dynamic output stabilization.
  • Multi-functionality.
  • Expandability.
  • Convenient and efficient pass-through technique.
  • Pre-configured tests
  • Test & results storage, download and reporting
  • Internet connection

APPLICATIONS

  • Primary current injection testing.
  • Relay testing.
  • Current Transformer testing.
  • Recloser and Sectionalizers.
  • Switchgear Testing.
  • Heat runs.
  • Ground Grid testing.
more information

High current Raptor configurations

Raptor C-05

Raptor1

  • 1 Master unit
  • 1 Control interface Raptor WA
  • 1 Set of standard accessories
  • Power: 3 kVA This configuration is for applications where the High Current injection is not very demanding, for applications that require working close to the load, such as CT, VT, PT, polarity, load saturation and relay timing test, among others. The Raptor has the ability to work at different frequencies, even with the high current output, from 20 to 400 Hz, making it adequate for testing low level signals, free of the noise and interferences generated at the network fundamental frequency.

 

Raptor C-15

  • 1 master unit
  • 1 slave unit
  • 1 Control interface Raptor WA
  • 1 Set of standard accessories – Power: 8.2 kVA This configuration is for applications where the High Current injection values require more power (compliance voltage) to reach the desired current in the test object using either lower cross section cables, which are easier to handle, or longer higher cross section cables to increase the distance to the object under test. The Raptor Slave unit has twice the power of the Master unit.

Raptor C-25

  • 1 master unit
  • 2 slave units
  • 1 Control interface Raptor WA
  • 1 Set of standard accessories
  • Power: 13.3 kVA This configuration is for applications where the High Current injection values are high enough to require more power (compliance voltage) to reach the desired current in the test object, which usually requires long cables.Using this configuration instead of the C-15 will avoid the need to wind turns on it to be able to reach a distant load, achieving higher currents. This configuration is adequate for injection of high current levels (>4000 A) into loads situated at a typical distance (around 3 meters) of the test set, using of course, cables with the required cross section.

 

Raptor C-35

  • 1 master unit
  • 3 slave units
  • 1 Control interface Raptor WA
  • 1 Set of standard accessories
  • Power: 18.4 kVA This configuration is for applications where the High Current injection values are high enough to require even more power (compliance voltage) to reach the desired current in the test object, which usually requires long cables. Using this configuration instead of the C-25 will avoid the need to wind turns on it to be able to reach a distant load, achieving higher currents. Each RAPTOR SL unit added to the system makes for almost twice the power of the MASTER. This configuration is sufficient adequate for injection of very high current levels (>8000 A) into loads situated close in distance (around 1 meter) of the test set, using of course, cables with the required cross section. Low voltage CB up to a nominal of 1500 A can be properly tested.

Raptor C-45

  • 1 master unit
  • 4 slave units
  • 1 Control interface Raptor WA
  • 1 Set of standard accessories
  • Power: 23.5 kVA This configuration is for applications where the High Current injection values are high enough to require even more power (compliance voltage) to reach the desired current in the test object, which usually requires long cables. Using this configuration instead of the C-35 will avoid the need to wind turns on it to be able to reach a distant load, achieving higher currents. Each RAPTOR SL unit added to the system makes for almost twice the power of the MASTER. This configuration is sufficient adequate for injection of very high current levels (>11000 A) into loads situated close in distance (around 1 meter) of the test set, using of course, cables with the required cross section.

 

 

Contact

CONTACT
Close